  • 1(1713424143881).jpg
  • 2(1713424152965).png
  • 3(1713424161041).png
  • 4.webp
  • 5.webp
  • 6(1713424184413).webp
  • 7(1713424192451).png
  • 8(1713424200908).webp
  • 9.webp
  • 10(1713424216236).png

Fire resistant and breathable cap

Categories:

Views

Hong Kong Qingshan Power Plant 7000m undertaken by our company ³ Wave pattern painting on the outer wall of process water tank is completed! Recently, our company undertook 7000 m of Hong Kong Qingshan Power Plant ³ The external wall of process water tank is painted with wavy pattern. The completion of this work also indicates that Hong Kong Qingshan Power Plant is 7000m ³ The process water tank construction and installation project has been formally completed and will be put into formal production. 


阻燃透气帽的顶盖由耐火铝板制成,外壳由铸铝制成。阻燃芯有两种类型:不锈钢波纹板和铝波纹板,符合CB-5908-2005的技术要求。当油箱材料膨胀或进入时,通过阻燃芯波纹板向外排放。当油从油箱中释放出来时,它会被再次吸入,以防止和消除所有火源通过,确保油箱的安全。


Details


1、 Product Overview:
The flame retardant breathable cap (abbreviated as the breathable cap) is an important supporting equipment to ensure the breathable safety of gas stations, oil tanks, and other facilities. The connection forms of the breathable cap include flange connection and threaded connection.
2、 Product features:
The top cap of the flame retardant and breathable cap is made of fire-resistant aluminum plate, and the shell is made of cast aluminum. There are two types of flame retardant cores: stainless steel corrugated plate and aluminum corrugated plate, which meet the technical requirements of CB-5908-2005. When the oil tank material expands or enters, it is vented outward through the flame retardant core corrugated plate. When oil is released from the tank, it is sucked in again to prevent and eliminate all sources of fire from passing through, ensuring the safety of the tank.
3、 Installation precautions:
The breathable cap should be installed vertically on the top of the oil tank to ensure a balance of pressure inside and outside the tank. To ensure the safety of the tank and gas station.
4、 Repair and maintenance:
The breathability of the flame retardant corrugated plate of the breathable cap should be checked regularly to ensure good flame retardant and breathable performance. During maintenance, unscrew the screws on the top cover of the breathable cap and loosen the screws that fix the flame retardant core. Take out the flame retardant core and check if it is blocked, deformed, or corroded. The flame retardant core should be cleaned or replaced immediately, and checked twice a month.
5、 Technical parameters:

名 称

规格

材质

阻火性能

耐烧性能

备  注

阻火透气帽

N50

铝合金

连续十三次以上阻爆

连续燃烧无回火

内螺法兰连接

阻火透气帽

N80

铝合金

连续十三次以上阻爆

连续燃烧无回火

法兰连接

 

 

 

 

 

Code for design and installation of large vertical oil tanks in China

1、 Executive standard:

1. Domestic design standard: GB50341-2003 Code for Design of Vertical Cylindrical Steel Welded Oil Tanks

2. Domestic construction standard: Code for Construction and Acceptance of Vertical Cylindrical Steel Welded Oil Tanks (GB 50128-2005)

2、 Design specification:

1. The codes used for the design of large oil tanks are mainly API 650, JIS B8501, British Industrial Standard BS2654 and Chinese National Standard GB50341 from a worldwide perspective. The formulas used in each code are derived from the formula for calculating the circumferential stress in the membrane theory. Combined with the stress characteristics of oil tanks, the allowable stress, weld joint coefficient and additional wall thickness become a complete wall thickness calculation formula, Each specification determines its own allowable stress and weld coefficient according to the performance characteristics of materials and construction technology level of its own country. Therefore, oil tanks of the same volume are calculated according to different specifications, and the calculation results of tank wall thickness sometimes vary greatly.

2. According to the performance characteristics of domestic materials and the allowable stress and weld joint coefficient specified by the overall level of domestic construction enterprises, the Chinese national standard GB50341-2003 is more in line with the national conditions. This code is basically adopted in the design of oil tanks in our country.

3、 Construction specifications:

1. Construction method: the construction of ordinary vertical storage tank basically adopts the chain inversion method: construction preparation → material inspection → blanking → processing → inspection → welding of tank bottom middle plate → bow edge plate of tank bottom → center column Erection of umbrella frame → assembly and welding of top ring → assembly and welding of wrapped angle steel → assembly of temporary vault support → guide chain lifting device → assembly and welding of vault → assembly and welding of lower ring → jacking of top ring wall plate → circumferential seam welding → assembly and welding of each circumferential seam → assembly and welding of bottom ring bottom plate corner seam → bottom plate edge plate → inspection → accessory installation → vacuum test → overall test → settlement observation → handover.

2. Tank body prefabrication: three arc templates: one template for checking the curvature of the vault, with chord length not less than 2m; Check one inner arc sample plate with chord length not less than 1m for deformation of vertical weld corner; Check one outer arc sample plate for vertical weld deformation, and its chord length shall not be less than 1m.

3. Tank body assembly: according to the tank installation sequence, the lower surface of the bottom plate shall be protected against corrosion before installation. Before laying the base plate, the vertical and horizontal cross center lines shall be drawn on the surface on the basis of qualified acceptance. When the center line deviation marked by civil engineering is large (but within the allowable range), it shall be adjusted to the minimum.

4. Tank welding and weld inspection: the welding process assessment of butt joints, T-shaped fillet welds and tubesheet shall be carried out according to JB4708-92 Welding Process Assessment of Steel Pressure Vessels, and the on-site welding process instructions shall be prepared. The radiographic inspection of tank welds shall be carried out according to GB3323-87 Radiography and Quality Grading of Butt Joints of Fusion Welding of Steel.

4、 Test method:

1. Tank body test: vacuum leak test for the bottom plate. The vacuum method shall be used to test the leak of all the bottom plate welds. The vacuum degree shall not be less than 53Kpa, and the penetrant flaw detection method shall be used for reinspection.

2. Water filling test of tank body: floating plate lifting test, foundation settlement observation. Then, temporarily close all the openings on the upper part, open the transparent holes on the tank top, and fill the tank with water. The test water shall be fresh water, the water temperature shall not be lower than 5 ℃, and the pressure shall be maintained for 48 hours.

3. Tightness test, strength test and stability test of the tank wall and top: when filling the tank with water, when the water level is higher than 1m, close the transparent hole and foam vent on the tank top, continue to fill the tank with water, and set a temporary pressure gauge on the tank top to observe the pressure reading. The pressure stabilization test shall be carried out after the water filling test. When the water filling reaches the maximum operating liquid level, all openings shall be closed, and the drainage shall be carried out slowly. The negative pressure in the tank shall be generated, and the negative pressure reading